Utility Franchises

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Regulations for Utility Franchises performing work in the Public Right-of-Way (RW)

When doing work in the Public Right-of-Way (RW), utility franchises must submit a proper City permit, a detailed description of proposed work with start-up and completion dates as well as a sketch or plat drawing. Included with the permit application will be a Traffic Control Plan (TCP) and if the work impacts pedestrians, you’ll need to provide a Sidewalk Closure Plan (SCP). The turnaround time for a review is approximately 24hrs and/or up to five (5) business days.

The City will notify applicants electronically so please include an email address along with a direct phone number. All utility franchises are required to submit a list of all sub-contractors used with their contact information. The City is required to verify with the state that sub-contractors are performing work with a current license.

Below you will find links to the required City permit and the applicable sections of the Coos Bay Municipal Code:

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Windows Media Player Download Word Viewer Download Excel Viewer Download PowerPoint Viewer